Portfolio Category: Projects category 1

Painting Appliances

A major appliance manufacturer requires the application of clear coat “fingerprint free” paint for a line of their products. Appliance parts are stored in our warehouse for “just in time” shipping. Once the appliances are prepared for painting, they are sprayed then cured. After a thorough quality control inspection, each part is carefully re-packaged for shipping back to manufacturer....

Painting Mufflers

An automotive supplier requires their muffler and exhaust pipes be painted with a high temperature protective and decorative finish. Parts arrive at one of our facilities where they are removed from the packaging and placed onto an automated wash line. The parts undergo a six stage washing and drying cycle before they are coated by our team of expert painters. After curing, each part must pass a quality control inspection before being re-packaged for shipping back to the supplier....

Coating Brake Pads

A recent project required the application of a thermally activated adhesive coating be applied to an automotive brake backing pad for a customer. For our customers’ convenience, a wide variety of backing pads are stored in our warehouse, where they are sorted, sprayed, and delivered “just in time” as needed daily via a continuous batch process. Quality control of all of our work is of utmost importance, and each and every individual part undergoes a complete inspection before leaving our plant....

Parts Washing

An automotive supplier requires the cleaning of many tons of small metal parts to remove grease and oil that accumulate during the manufacturing process. Parts are loaded into one of our parts washing machines where a six stage treatment process cleans, de-greases, and dries each part before they are re-packaged according to the customers’ requirements, and shipped back to the supplier....